Skip to Content
Streetsblog Massachusetts home
Streetsblog Massachusetts home
Log In
DCR

Eyes On the Street: ‘Clippership Connector’ Comes Together in Downtown Medford

A gravel path under construction behind a metal fence next to a grassy lawn

Path construction near Riverside Towers in Medford Square, photographed on Wednesday, May 29, 2024.

This summer, workers are building a missing link in the network of Mystic River waterfront greenways that will bring the the network of riverfront paths into downtown Medford.

The Clippership Connector project (dashed green line) and the existing network of Mystic River greenways (solid lines) in Medford.

The Clippership Connector path is relatively short – it's only about half a mile long – but it will give Medford a safe, relatively scenic way to get across Interstate 93, a major barrier in the city, and connect its downtown area with its riverfront parks and schools in the fast-growing districts near the Wellington Orange Line station.

The trail threads its way between several privately-owned properties, which created some challenging design constraints. At several points the trail will run along elevated boardwalks, like this one just west of Interstate 93, to minimize impacts to the riverbanks.

Workers behind a metal fence install planks on a new boardwalk along a tree-lined river.
A new riverfront boardwalk, seen here under construction, will carry the new Clippership Connector trail around the edge of the Medford Housing Authority's property west of Interstate 93. Photographed on May 29, 2024.

While it's common for people to start using new trails while they're still under construction, that's not really an option here – at least for the time being. Contractors have lined the future trail with fencing, making it impossible to use the trail while it's still under construction.

For now, if you're looking to walk or bike between Medford Square and the other existing Mystic River paths to the southeast, your best option is to take Riverside Avenue from Medford Square, then cut south on Freedom Way to access the riverfront behind Madeleine Dugger Andrews Middle School (see map above).

For more information about the project, read our coverage from 2020, written when the project was still under design:

Stay in touch

Sign up for our free newsletter

More from Streetsblog Massachusetts

USDOT Cancels $20 Million Pledge to Fund Street and Transit Improvements In Roxbury

The grant cancellation is part of a nationwide wave of funding cuts for projects that the Trump administration opposes.

September 17, 2025

Video: Boston’s E-Bike Program Lets Mattapan Couple Regain Their Mobility

Dr. Steven Leonard had been housebound with a back injury since 2010, but a new recumbent e-bike is letting him explore his neighborhood again.

September 16, 2025

Massachusetts Lawmakers Sit On the Sidelines As Trump Shreds the State’s Climate Plans

The state was already falling behind its electric vehicle goals before Trump took office – but the outlook is even dimmer now.

September 15, 2025
See all posts