Trails
News topics:
From Framingham to Lowell, Progress Continues on a 25-Mile Bike Path Through Boston’s Western Suburbs
Additional trail sections to extend the trail further south, towards Framingham, and further north, towards downtown Lowell, are in the planning stages.
June 28, 2022
New Paths in Peabody Will Fill Missing Links on Border-to-Boston Trail
A project to extend the Independence Greenway eastward towards downtown Peabody could go under construction in 2024; a second project to connect the Greenway's two segments and also connect the Greenway to the Danvers Rail Trail is also being designed.
June 27, 2022
MassDOT Plans Two New Roundabouts for Dangerous Worcester Intersection
Last week, MassDOT shared their plans to convert a dangerous pair of intersections on Worcester’s west side to two roundabouts in an effort to improve safety and provide better pedestrian and bicycle accommodations next to the Worcester State University campus.
June 21, 2022
See MassDOT’s Early Designs for a New Car-Free Bridge Over the Pike in Allston
As part of MassDOT's Allston Multimodal Project, Allston's Franklin Street footbridge will be replaced with a new car-free overpass that meets ADA standards and offers a smoother connection into the surrounding neighborhoods.
June 15, 2022
Boston Plans Wider Sidewalks, Protected Bikeway for State Street Downtown
During a virtual public hearing in the fall of 2020, city officials said that the project was expected to go under construction in 2021. The project now looks unlikely to get underway until 2023 at the earliest.
June 13, 2022
Two New Trail Links Open, Connecting Greenways North of Boston
A tour of the new Charlestown Seawall trail, which connects Draw 7 Park in Somerville to Alford Street in Boston, and the new Watertown-Cambridge Greenway, which connects the Alewife Red Line station to Watertown Square.
May 9, 2022
NYC ‘Clean Curbs’ Pilot Will Move Garbage Off Sidewalks Into On-Street Bins
A pilot program to get trash bags off sidewalks will move beyond Manhattan — first, to Brooklyn. But can it do enough fast enough to curtail 'NY's 5 o'clock shadow'?
April 21, 2022
Bedford Town Meeting Narrowly Rejects Long-Planned Reformatory Branch Trail Upgrades
The Reformatory Branch is currently an unimproved and frequently muddy pathway for most of its length, and is only accessible to able-bodied hikers and mountain bikers.
April 5, 2022
Arlington Makes Plans to Connect Minuteman, Mystic River Paths
The Town of Arlington is soliciting feedback on a possible new multi-use path that would connect the Alewife Brook Greenway to Arlington Center and the Minuteman Bike Path along the Mystic River waterfront.
April 4, 2022
Eyes On the Green Line: Somerville’s New Community Path Is Coming Together
The new Community Path Extension in Somerville is beginning to look like a usable trail, with new light fixtures and a base layer of pavement in place.
February 21, 2022