Skip to content

DCR Begins Construction On A New Riverfront Path Connection Near Wellington

Construction is expected to continue through the spring of 2028.
A colored sketch plan of a new bike trail that will run under the Route 28/Wellington Bridge (center, running horizontally through the image). The trail consists of a boardwalk (in brown) that runs over the water and under the bridge, pictured at the left of the image in a wide 'C' shape. The boardwalk connects to a network of pathways on either side of the bridge, pictured as thick grey lines at the top and bottom of the image.
Plans for the new Wellington Underpass shared-use pathway connection in Medford consist of a boardwalk over the Mystic River (left, in brown) and connecting pathways on either side of the Fellsway. Courtesy of MassDOT.

Next Monday, August 10, the Department of Conservation and Recreation (DCR) and MassDOT will begin construction on a new bicycle and pedestrian underpass under the Wellington Bridge in Medford to fill in a critical missing link in the growing network of shared-use pathways and parklands along the Mystic River.

New buffered bike lanes have been painted on the Fellsway across the Mystic River, just south of Wellington Circle. Flexible-post bollards are expected to be installed soon.
The Wellington Bridge, pictured here in a June 2021 photo, carries the 6-lane Fellsway highway across the Mystic River, just south of Wellington Circle.

The new path will consist of a 14-foot-wide wooden boardwalk that will loop under the Wellington Bridge’s northern abutments in the City of Medford.

The project will also install connecting shared-use pathways to link to existing path networks in Macdonald Park and around the Wellington MBTA station. Planned new curb cuts along the bike lanes on the Fellsway will give bicycle users a more seamless transition between the off-street paths and the on-road bike lanes on the Wellington Bridge.

The DCR warns that construction, which is expected to last until spring 2028, could disrupt access to some of the paths in the area, but that it plans to maintain access for bikes and pedestrians along the Wellington Bridge, which connects Medford and Somerville, and into Macdonald Park.

DCR also recently finished another path connection to the northwest of MacDonald Park, the “Clippership Connector,” which we covered last summer.

When the new Wellington Underpass connection is complete, Medford will have a continuous riverfront shared-use path network that extends from Medford Square all the way to the Wellington Orange Line station at the mouth of the Malden River.

Photo of Christian MilNeil
Christian has edited StreetsblogMASS since its founding in spring 2019. Before that, he was a data reporter for the Portland Press Herald in Maine. Got tips? Send them to me via Signal, the encrypted messaging app, at 207-310-0728.

Read More:

More from Streetsblog Massachusetts

Monday’s Headlines Live Happily Ever After

November 2, 2026

Gov. Healey Cuts the Ribbon On Fall River’s Waterfront Highway-to-Boulevard Conversion

October 30, 2026

Eyes On the Street: DCR Tames Traffic Next to Boston’s Arnold Arboretum

October 28, 2026

Study: The Missing Ingredient in the Fight To End Car Crash Deaths is… Fewer Cars

October 27, 2026

Why Deadly, Illegal E-Motos Are On The Rise – And Why E-Bikes Are Being Blamed When They Crash

October 26, 2026
See all posts