All Articles
The Cops’ Directing-Traffic Racket Is Delaying Safety Projects
The MBTA has been waiting for 8 months for a police detail to show up to Washington Street in Oak Square so that its workers can finally paint some new crosswalks.
Car-Free Mystic River Bridge Will Begin Construction In 2024
"We are on schedule for the project to go out to bid at the end of the calendar year," a state official confirmed for StreetsblogMASS.
MassTrails Program Announces $11 Million in Grants for 68 Trail Projects
The state has announced $11.6 million in funding for 68 local trail construction and enhancement projects across the Commonwealth.






![A person on a bike rides past a green bike signal alongside a walk sign while roughly a dozen cars wait at a red light on the opposite side of the street. A sign in the foreground reads "Turning vehicles yield to [bike and pedestrian pictograms]" while a sign next to the walk signal says "No Turn On Red." The street is lined with 3-5 story brick buildings.](https://lede-admin.mass.streetsblog.org/wp-content/uploads/sites/49/2023/06/SeparatedSignalsMassAveInCambridge_creditPetruSofio.jpeg?resize=2880%2C1920)


