DCR
News topics:
New Trails We Can Look Forward To In 2025
In the past year, Massachusetts trailbuilders cut the ribbon on about 15 miles' worth of new car-free bike and pedestrian trails.
December 30, 2024
DCR Will Start Tearing Out Pavement for Memorial Drive Narrowing Project In 2025
A long-planned project to improve riverfront paths and reduce the width of the Memorial Drive highway in Cambridge from 4 lanes to 2 lanes will get underway next year.
December 13, 2024
Eyes On the Street: State Conservation Agency Converts Asphalt to Parkland In Newton
A dramatic transformation of Hammond Pond Parkway in Newton demonstrates what can happen when the state's Department of Conservation and Recreation (DCR) actually prioritizes conservation and recreation over traffic and pollution.
December 2, 2024
State Officials Say Work to Improve Safety at Lethal Memorial Drive Crash Site Will Begin On Monday
The state's parks agency will reduce Memorial Drive's speed limit and create more space for the area's busy bike and pedestrian traffic.
October 4, 2024
SUV Driver Kills Bicyclist On Memorial Drive Bike Path in Cambridge
The state's Department of Conservation and Recreation, which owns Memorial Drive, had previously received serious warnings about safety hazards at the site of the killing.
September 24, 2024
MassTrails Program Grants $12 Million for 65 Trail Projects Statewide
On Friday, state and municipal officials from across the Commonwealth convened near the Upper Charles Trail in downtown Holliston to announce $12 million worth of grants that will fund dozens of trail design, construction, and maintenance projects across Massachusetts.
June 24, 2024
Will A New Rail Bridge Across the Charles Include a Long-Promised Walkway to North Station?
The MBTA appears to be moving ahead with plans to replace a major drawbridge next to North Station without a long-planned bike and pedestrian path that would have connected riverfront parks in Boston and Cambridge.
June 5, 2024
Eyes On the Street: ‘Clippership Connector’ Comes Together in Downtown Medford
This summer, workers are building a missing link in the network of Mystic River waterfront greenways that will bring the the network of riverfront paths into downtown Medford.
June 3, 2024
Eyes On the Street: Less Pavement, More Park On Hammond Pond Parkway
Earlier this week, StreetsblogMASS reader Aaron Lu shared some photos of the Department of Conservation and Recreation's Hammond Pond Parkway road diet, which is converting a a four-lane highway without any sidewalks into a calmer two-lane street with a separated 12-foot-wide shared-use path and additional greenery in lieu of asphalt.
May 8, 2024
Mystic River Bridge Design, Timeline Still Shrouded In Mystery, Globe Confirms
Today, the Boston Globe published a reminder that we still have no idea when or how the state's Department of Conservation and Recreation will build a long-planned bridge over the Mystic River to connect Everett to the Assembly Orange Line Station (see map above).
April 15, 2024